Moving the old electrics

29th January 2020 – The very old electric meters and fuse box needed to be upgraded and moved before the side extension was due to be demolished. Electricity board had to carry out emergency works to get us re-connected. Hot gloving was used which was quite a thing to watch..

Although all this was done – the electric meter installation was delayed so no power until 10pm – but the log burner kept us warm, kettle boiled and eggs fried for sandwiches..

Leave a Reply